NZ607113A - A method for estimating job run time - Google Patents
A method for estimating job run timeInfo
- Publication number
- NZ607113A NZ607113A NZ607113A NZ60711310A NZ607113A NZ 607113 A NZ607113 A NZ 607113A NZ 607113 A NZ607113 A NZ 607113A NZ 60711310 A NZ60711310 A NZ 60711310A NZ 607113 A NZ607113 A NZ 607113A
- Authority
- NZ
- New Zealand
- Prior art keywords
- data processing
- prediction algorithm
- job
- operational parameters
- run time
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4812—Task transfer initiation or dispatching by interrupt, e.g. masked
- G06F9/4818—Priority circuits therefor
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computing arrangements using knowledge-based models
- G06N5/02—Knowledge representation; Symbolic representation
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Computational Linguistics (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Computing Systems (AREA)
- Mathematical Physics (AREA)
- Debugging And Monitoring (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi Processors (AREA)
- Record Information Processing For Printing (AREA)
- Accessory Devices And Overall Control Thereof (AREA)
- Facsimiles In General (AREA)
Abstract
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NZ607113A NZ607113A (en) | 2010-07-08 | 2010-07-08 | A method for estimating job run time |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NZ586691A NZ586691A (en) | 2010-07-08 | 2010-07-08 | Method for estimating time required for a data processing job based on job parameters and known times for similar jobs |
| NZ607113A NZ607113A (en) | 2010-07-08 | 2010-07-08 | A method for estimating job run time |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| NZ607113A true NZ607113A (en) | 2014-08-29 |
Family
ID=45441399
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NZ607113A NZ607113A (en) | 2010-07-08 | 2010-07-08 | A method for estimating job run time |
| NZ586691A NZ586691A (en) | 2010-07-08 | 2010-07-08 | Method for estimating time required for a data processing job based on job parameters and known times for similar jobs |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NZ586691A NZ586691A (en) | 2010-07-08 | 2010-07-08 | Method for estimating time required for a data processing job based on job parameters and known times for similar jobs |
Country Status (3)
| Country | Link |
|---|---|
| US (2) | US9058216B2 (en) |
| NZ (2) | NZ607113A (en) |
| WO (1) | WO2012005611A1 (en) |
Families Citing this family (41)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2629247B1 (en) | 2012-02-15 | 2014-01-08 | Alcatel Lucent | Method for mapping media components employing machine learning |
| CN104067219B (en) * | 2012-03-15 | 2019-08-02 | 慧与发展有限责任合伙企业 | Determining a schedule for jobs to replicate objects stored on storage |
| US9510033B1 (en) | 2012-05-07 | 2016-11-29 | Amazon Technologies, Inc. | Controlling dynamic media transcoding |
| US9483785B1 (en) | 2012-05-07 | 2016-11-01 | Amazon Technologies, Inc. | Utilizing excess resource capacity for transcoding media |
| US11989585B1 (en) | 2012-05-07 | 2024-05-21 | Amazon Technologies, Inc. | Optimizing media transcoding based on licensing models |
| US9710307B1 (en) * | 2012-05-07 | 2017-07-18 | Amazon Technologies, Inc. | Extensible workflows for processing content |
| US9396088B2 (en) * | 2013-03-08 | 2016-07-19 | Sap Se | Computer execution progress indicator |
| US10410260B1 (en) * | 2013-09-12 | 2019-09-10 | West Corporation | Auctioning and management of cloud-based services |
| US9825949B2 (en) | 2014-03-26 | 2017-11-21 | Rockwell Automation Technologies, Inc. | Device authentication to facilitate secure cloud management of industrial data |
| US9971317B2 (en) * | 2014-03-26 | 2018-05-15 | Rockwell Automation Technologies, Inc. | Cloud-level industrial controller loop gain tuning based on industrial application type |
| US9843617B2 (en) | 2014-03-26 | 2017-12-12 | Rockwell Automation Technologies, Inc. | Cloud manifest configuration management system |
| US9886012B2 (en) | 2014-03-26 | 2018-02-06 | Rockwell Automation Technologies, Inc. | Component factory for human-machine interface migration to a cloud platform |
| US9838476B2 (en) | 2014-03-26 | 2017-12-05 | Rockwell Automation Technologies, Inc. | On-premise data collection and ingestion using industrial cloud agents |
| US10208947B2 (en) | 2014-03-26 | 2019-02-19 | Rockwell Automation Technologies, Inc. | Cloud-level analytics for boiler networks |
| US9866635B2 (en) | 2014-03-26 | 2018-01-09 | Rockwell Automation Technologies, Inc. | Unified data ingestion adapter for migration of industrial data to a cloud platform |
| US9614963B2 (en) | 2014-03-26 | 2017-04-04 | Rockwell Automation Technologies, Inc. | Cloud-based global alarm annunciation system for industrial systems |
| US10095202B2 (en) | 2014-03-26 | 2018-10-09 | Rockwell Automation Technologies, Inc. | Multiple controllers configuration management interface for system connectivity |
| US20170235605A1 (en) * | 2014-05-06 | 2017-08-17 | NetSuite Inc. | System and method for implementing cloud based asynchronous processors |
| US10686869B2 (en) * | 2014-09-29 | 2020-06-16 | Microsoft Technology Licensing, Llc | Tool for investigating the performance of a distributed processing system |
| WO2016069038A1 (en) * | 2014-10-30 | 2016-05-06 | Hewlett Packard Enterprise Development Lp | Policy based workload scaler |
| US9788085B2 (en) * | 2015-04-29 | 2017-10-10 | The Boeing Company | System and method of determining network locations for data analysis in a distributed ecosystem |
| US10417226B2 (en) | 2015-05-29 | 2019-09-17 | International Business Machines Corporation | Estimating the cost of data-mining services |
| KR102607808B1 (en) * | 2015-09-11 | 2023-11-30 | 삼성전자주식회사 | Dynamic reallocating resources for optimized job performance in distributed heterogeneous computer system |
| US20180365608A1 (en) * | 2015-11-12 | 2018-12-20 | Wisetech Global Limited | Quantitive time estimation systems and methods of project management systems |
| US10115057B2 (en) | 2016-02-08 | 2018-10-30 | International Business Machines Corporation | Estimating analytic execution times |
| US10764255B2 (en) | 2016-09-21 | 2020-09-01 | Rockwell Automation Technologies, Inc. | Secure command execution from a cloud monitoring system to a remote cloud agent |
| US10671578B2 (en) * | 2016-12-15 | 2020-06-02 | International Business Machines Corporation | System and method for dynamically estimating data classification job progress and execution time |
| US10187252B2 (en) * | 2016-12-27 | 2019-01-22 | Cisco Technology, Inc. | Configuring heterogeneous computing environments using machine learning |
| US10778599B2 (en) * | 2017-03-30 | 2020-09-15 | Home Box Office, Inc. | Predictive scaling of computing resources |
| US10417044B2 (en) | 2017-04-21 | 2019-09-17 | International Business Machines Corporation | System interventions based on expected impacts of system events on scheduled work units |
| US11327473B2 (en) | 2017-07-11 | 2022-05-10 | Rockwell Automation Technologies, Inc. | Dynamically reconfigurable data collection agent for fracking pump asset |
| US10482063B2 (en) | 2017-08-14 | 2019-11-19 | Rockwell Automation Technologies, Inc. | Modular control manifest generator for cloud automation |
| US10416660B2 (en) | 2017-08-31 | 2019-09-17 | Rockwell Automation Technologies, Inc. | Discrete manufacturing hybrid cloud solution architecture |
| US10671445B2 (en) * | 2017-12-04 | 2020-06-02 | Cisco Technology, Inc. | Cost-optimal cluster configuration analytics package |
| US11200512B2 (en) | 2018-02-21 | 2021-12-14 | International Business Machines Corporation | Runtime estimation for machine learning tasks |
| CN109636212B (en) * | 2018-12-19 | 2023-06-16 | 中国科学技术大学 | Method for predicting actual running time of job |
| US10999403B2 (en) | 2019-09-27 | 2021-05-04 | Red Hat, Inc. | Composable infrastructure provisioning and balancing |
| US11561801B2 (en) | 2020-04-24 | 2023-01-24 | Red Hat, Inc. | Predicting execution duration for user-defined functions on function-as-a-service (FaaS) cloud computing platforms |
| US11490243B2 (en) | 2020-10-20 | 2022-11-01 | Cisco Technology, Inc. | Open roaming multi-access cost optimizer service |
| US12159238B2 (en) | 2020-12-10 | 2024-12-03 | International Business Machines Corporation | Automated machine learning model selection |
| EP4352617A4 (en) * | 2021-06-10 | 2025-04-16 | Sailion Inc. | METHOD AND SYSTEM FOR PROCESSING DISTRIBUTED WORKLOAD |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003029989A (en) * | 2001-07-16 | 2003-01-31 | Matsushita Electric Ind Co Ltd | Distributed processing system and job distributed processing method |
| US20040044600A1 (en) * | 2002-08-27 | 2004-03-04 | Chu Hao-Hua | Cost management for a distributed computing environment |
| JP5251002B2 (en) * | 2007-05-25 | 2013-07-31 | 富士通株式会社 | Distributed processing program, distributed processing method, distributed processing apparatus, and distributed processing system |
| JP5296373B2 (en) | 2007-12-26 | 2013-09-25 | インターナショナル・ビジネス・マシーンズ・コーポレーション | Technology that provides processing time in advance |
| JP2009266044A (en) | 2008-04-26 | 2009-11-12 | Mitsubishi Electric Corp | Software processing time estimation system and software processing time estimation method |
-
2010
- 2010-07-08 NZ NZ607113A patent/NZ607113A/en not_active IP Right Cessation
- 2010-07-08 NZ NZ586691A patent/NZ586691A/en not_active IP Right Cessation
-
2011
- 2011-07-08 WO PCT/NZ2011/000128 patent/WO2012005611A1/en not_active Ceased
- 2011-07-08 US US13/808,203 patent/US9058216B2/en not_active Expired - Fee Related
-
2015
- 2015-06-03 US US14/729,923 patent/US20150363226A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| US20150363226A1 (en) | 2015-12-17 |
| NZ586691A (en) | 2013-03-28 |
| WO2012005611A1 (en) | 2012-01-12 |
| US9058216B2 (en) | 2015-06-16 |
| US20140115592A1 (en) | 2014-04-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NZ607113A (en) | A method for estimating job run time | |
| PH12019501207A1 (en) | Vehicle insurance risk prediction method and apparatus, and server | |
| GB2539845A (en) | Offline training of hierarchical algorithms | |
| PH12011000291A1 (en) | Methods and apparatus to manage process control search results | |
| AU2017252091A1 (en) | Method and system for energy consumption prediction | |
| GB2558423A (en) | Tuning predictions of wellbore operation parameters | |
| WO2011049885A3 (en) | Full-waveform inversion in the traveltime domain | |
| EP2677518A3 (en) | Method for providing voice recognition function and electronic device thereof | |
| WO2011107751A3 (en) | System and method for inputting text into electronic devices | |
| IN2014MU01987A (en) | ||
| EP2811424A3 (en) | Method and apparatus for training an estimator for estimating a pose of an articulated object | |
| GB201116221D0 (en) | Autonomous vehicle and task modelling | |
| WO2013096842A3 (en) | Methods and systems for in silico experimental designing and performing a biological workflow | |
| Raheem et al. | Absolute penalty and shrinkage estimation in partially linear models | |
| WO2016016731A3 (en) | Method and apparatus for categorizing device use case | |
| EP2793175A3 (en) | Optimization utilizing machine learning | |
| WO2013081655A3 (en) | Method and system for generating and/or repairing a surface model of a geometric structure | |
| MX371169B (en) | Predicting multiples in survey data. | |
| WO2015156989A3 (en) | Modulating plasticity by global scalar values in a spiking neural network | |
| WO2014001750A3 (en) | Adaptive fault tracking | |
| MX2013012041A (en) | Method and apparatus for quantization level clipping. | |
| WO2012019001A3 (en) | Returning estimated value of search keywords of entire account | |
| WO2012112534A3 (en) | Learning to predict effects of compounds on targets | |
| EP2333697A3 (en) | Information processing apparatus, information processing method, and program | |
| EP2645310A3 (en) | Case-based adaptation framework for customization knowledge in enterprise systems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PSEA | Patent sealed | ||
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2016 BY CPA GLOBAL Effective date: 20150717 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2017 BY CPA GLOBAL Effective date: 20160715 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2018 BY CPA GLOBAL Effective date: 20170713 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2019 BY CPA GLOBAL Effective date: 20180712 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2020 BY CPA GLOBAL Effective date: 20190712 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2021 BY CPA GLOBAL Effective date: 20200709 |
|
| ASS | Change of ownership |
Owner name: MICROSOFT TECHNOLOGY LICENSING, LLC, US Effective date: 20201105 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2022 BY CPA GLOBAL Effective date: 20210715 |
|
| RENW | Renewal (renewal fees accepted) |
Free format text: PATENT RENEWED FOR 1 YEAR UNTIL 26 AUG 2023 BY CPA GLOBAL Effective date: 20220715 |
|
| LAPS | Patent lapsed |