From the course: Investment Evaluation
Unlock the full course today
Join today to access over 24,800 courses taught by industry experts.
Solution 6: Choose a project based on NPV, IRR, and payback period - Microsoft Excel Tutorial
From the course: Investment Evaluation
Solution 6: Choose a project based on NPV, IRR, and payback period
- [Instructor] We're on our very last challenge of the course, and this is kind of the culminating project, if you will. And if you just want the fully workpad exercise file you can take a look at 04_12_Solution6 from the exercise files. And this is just so much fun. Let's take a look at these two projects. We have two projects to choose from, and we're gonna see if these are both acceptable projects on their own, and which one we would pick if we had to choose one or the other. So I've shown you the net cash flow, I've shown you the net cash flow in project two here, and I've shown you the net sum. Notice how the net sum. At the end of the day if you look at the bottom line after seven years your net sum is the exact same. But I'm gonna show you that these projects themselves are not the same. So let's calculate the NPV, IRR, Payback Period individually for each project. You already know how to do NPV, so in cell F6 equals NPV open parenthesis, my rate is 6% and my values are from B5…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
-
(Locked)
What is IRR?1m 47s
-
(Locked)
IRR calculation the long way3m 10s
-
(Locked)
The case of no IRR1m 47s
-
(Locked)
The case of multiple IRRs5m 10s
-
(Locked)
IRR using the Microsoft Excel formula6m 24s
-
(Locked)
Challenge 5: Calculate NPV and IRR1m 3s
-
(Locked)
Solution 5: Calculate NPV and IRR3m 37s
-
(Locked)
Pros and cons of IRR1m 26s
-
(Locked)
Payback period2m 15s
-
(Locked)
Payback period in Microsoft Excel2m 31s
-
(Locked)
Challenge 6: Choose a project based on NPV, IRR, and payback period33s
-
(Locked)
Solution 6: Choose a project based on NPV, IRR, and payback period4m 53s
-
(Locked)
Real talk: IRR and payback period4m 49s
-
(Locked)
-