From the course: Advanced Primavera P6
Unlock this course with a free trial
Join today to access over 25,300 courses taught by industry experts.
Fill Down - Primavera Tutorial
From the course: Advanced Primavera P6
Fill Down
- [Instructor] Do you need to quickly fill out a list of activities with the same information? If so, you can do so with the Fill Down feature. You do have to select the activity first, and you can hold Shift and select activities if they're in the same row, or hold the Control key and select them if there are a few activities in-between. Now right-click and select Fill Down. You will see that these changes were made in an instant. Makes life easy, right?
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
Refresh data: F521s
-
(Locked)
Schedule project: F935s
-
(Locked)
Data date27s
-
(Locked)
Running reports2m 16s
-
(Locked)
Free float vs. Total float42s
-
(Locked)
Group and sort1m 39s
-
(Locked)
Resolving negative float1m 25s
-
(Locked)
Fill Down31s
-
(Locked)
Expected Finish34s
-
(Locked)
Activity Network58s
-
(Locked)
Trace Logic44s
-
(Locked)
Adjusting resource units32s
-
(Locked)
Adjusting expenses units24s
-
-
-