-
Notifications
You must be signed in to change notification settings - Fork 6k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
planner: check DROP privilege for TRUNCATE PARTITION statement (#64024)
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#64225
opened Oct 31, 2025 by
jjshanks
Loading…
3 of 12 tasks
domain: release server id by revoke etcd session
do-not-merge/needs-triage-completed
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#64192
opened Oct 30, 2025 by
AmoebaProtozoa
Loading…
1 task done
pkg/parser/ast: (Fix) Propagate error correctly
contribution
This PR is from a community contributor.
do-not-merge/needs-tests-checked
do-not-merge/needs-triage-completed
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
ok-to-test
Indicates a PR is ready to be tested.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#64184
opened Oct 29, 2025 by
jfrabaute-arista
Loading…
planner: user filtering based in session and priviledge
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#64112
opened Oct 23, 2025 by
cpd007
Loading…
1 of 13 tasks
planner: fix TRUNCATE null handling with unsigned-flag check
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#64102
opened Oct 22, 2025 by
cpd007
Loading…
2 of 13 tasks
planner: fix CTE can not be pushed down to tiflash
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#64099
opened Oct 22, 2025 by
hawkingrei
Loading…
1 of 13 tasks
planner: attribute '{}' to clear all general user attributes.
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#64079
opened Oct 21, 2025 by
cpd007
Loading…
1 of 13 tasks
types: handle trailing characters in datetime parsing like MySQL
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#63875
opened Oct 9, 2025 by
DengY11
Loading…
2 of 13 tasks
expression: fix zero date check for getDateFromString
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#63720
opened Sep 24, 2025 by
GorilaMond
Loading…
1 of 13 tasks
planner: guard outer-join elimination to inner-only null-rejecting filters | tidb-test=pr/2606
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/needs-triage-completed
needs-cherry-pick-release-8.5
Should cherry pick this PR to release-8.5 branch.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#63504
opened Sep 15, 2025 by
King-Dylan
Loading…
2 of 13 tasks
plugin: add starting event for EXECUTE command.
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#63491
opened Sep 12, 2025 by
YangKeao
Loading…
1 of 13 tasks
types: ToHashKey need to use resultFrac
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#63256
opened Aug 28, 2025 by
yihong0618
Loading…
1 of 13 tasks
planner: fix the wrong ranger
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62752
opened Jul 31, 2025 by
hawkingrei
Loading…
1 of 13 tasks
fix: evalInt do not consider for HasBinaryFlag
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62688
opened Jul 29, 2025 by
yihong0618
Loading…
1 of 13 tasks
fix: close some permission issues
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#62432
opened Jul 16, 2025 by
yihong0618
Loading…
1 of 13 tasks
fix: add mutex to prevent concurrent btree.Clone() calls in infoschema v2
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62406
opened Jul 14, 2025 by
abrarr21
Loading…
1 of 13 tasks
parser: Fixed OptGConcatSeparator not returning nil when there is no explicit SEPARATOR
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#62401
opened Jul 14, 2025 by
gongna-au
Loading…
1 of 13 tasks
fix: close #59483 by correct type check vecEvalString in Inet6Ntoa
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61998
opened Jun 25, 2025 by
yihong0618
Loading…
1 of 13 tasks
planner: fix Wrong schema of ExchangeSender when expand operator is enabled
do-not-merge/needs-tests-checked
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#61911
opened Jun 21, 2025 by
hawkingrei
Loading…
13 tasks
types: interpret timestamp in DST transition backwards consistently as the first occurrence
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
planner: fix wrong push down epxression
do-not-merge/needs-tests-checked
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#61386
opened May 28, 2025 by
hawkingrei
•
Draft
13 tasks
planner: code refactoring for readability after AI test review
do-not-merge/needs-linked-issue
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
planner: merge the same PhysicalProjection
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#61202
opened May 20, 2025 by
hawkingrei
Loading…
1 of 13 tasks
ddl: remove unnecessary Indicates that a PR should not merge because it is a work in progress.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
PrefixNext() during iterateSnapshotKeys()
approved
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
#61027
opened May 8, 2025 by
tangenta
Loading…
1 of 13 tasks
ddl: set operation deadline for ModifyResourceGroup and DeleteResourceGroup
do-not-merge/needs-triage-completed
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#60651
opened Apr 18, 2025 by
NaturezzZ
Loading…
1 of 13 tasks
Previous Next
ProTip!
Exclude everything labeled
bug with -label:bug.