Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

planner: set an lower-bound for NDV used in out-of-range estimation for EQ conditions when the Histogram is empty | tidb-test=pr/2623 (#64139) cherry-pick-approved Cherry pick PR approved by release team. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#64220 by ti-chi-bot was closed Oct 31, 2025 Loading…
1 of 13 tasks
gc_worker: Stablize TestResolveLocksWithKeyspaces approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#64169 by MyonKeminta was merged Oct 30, 2025 Loading…
1 of 13 tasks
ddl: add timeout mechanism for add index analyze (#64096) approved cherry-pick-approved Cherry pick PR approved by release team. component/statistics lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#64164 by ti-chi-bot was merged Oct 30, 2025 Loading…
2 of 13 tasks
gc_worker: Refine some metrics about GC (#63888) ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-nextgen-20251011
#64148 by ti-chi-bot was closed Oct 28, 2025 Loading…
1 of 13 tasks
planner: set an lower-bound for NDV used in out-of-range estimation for EQ conditions when the Histogram is empty | tidb-test=pr/2623 approved lgtm needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#64139 by qw4990 was merged Oct 31, 2025 Loading…
1 of 13 tasks
ddl: make some MODIFY COLUMN skip row reorg (#63465) approved cherry-pick-approved Cherry pick PR approved by release team. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#64123 by ti-chi-bot was merged Oct 29, 2025 Loading…
1 of 13 tasks
planner: Flaky test cleanup approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#64119 by terry1purcell was merged Oct 24, 2025 Loading…
1 of 13 tasks
planner: optimize column lookups in PrepareIdxColsAndUnwrapArrayType with a map approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#64115 by henrybw was merged Oct 23, 2025 Loading…
1 of 13 tasks
*: fix typos in documentation and comments approved component/dumpling This is related to Dumpling of TiDB. contribution This PR is from a community contributor. first-time-contributor Indicates that the PR was contributed by an external member and is a first-time contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. skip-issue-check Indicates that a PR no need to check linked issue.
#64114 by atorrers was merged Oct 27, 2025 Loading…
1 of 13 tasks
fix: close 64103 by use the right quota approved contribution This PR is from a community contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. skip-issue-check Indicates that a PR no need to check linked issue.
#64104 by yihong0618 was merged Oct 23, 2025 Loading…
1 of 13 tasks
ddl: add timeout mechanism for add index analyze approved component/statistics lgtm needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#64096 by GMHDBJD was merged Oct 28, 2025 Loading…
2 of 13 tasks
ddl: Support and provide Keyspace ID to TiCI related API calls. | tidb-test=ef726505f262e22c6ec9c8951273bb5ee20abefb approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#64055 by OliverS929 was merged Oct 31, 2025 Loading…
1 of 13 tasks
planner: maintain a map of columns by ID in DataSource approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#64053 by henrybw was merged Oct 23, 2025 Loading…
1 of 13 tasks
ddl: multi-schema change validate table name before execution approved contribution This PR is from a community contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#64041 by River2000i was merged Oct 23, 2025 Loading…
1 of 13 tasks
planner: remove the default implementation of exhaustPhysicalPlans of all ops. approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#64011 by AilinKid was merged Oct 20, 2025 Loading…
1 of 13 tasks
metrics: add RU wait duration to TiDB monitor page approved contribution This PR is from a community contributor. first-time-contributor Indicates that the PR was contributed by an external member and is a first-time contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#63994 by hhwyt was merged Oct 21, 2025 Loading…
1 of 13 tasks
planner: classify enforcer related logic into enforce.go approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#63974 by AilinKid was merged Oct 15, 2025 Loading…
1 of 13 tasks
planner: create index with embedded analyze (#63143) approved cherry-pick-approved Cherry pick PR approved by release team. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#63964 by ti-chi-bot was merged Oct 28, 2025 Loading…
2 of 13 tasks
planner: integrate Skyline Pruning into index selection of IndexJoin | tidb-test=pr/2619 approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#63958 by qw4990 was merged Oct 31, 2025 Loading…
1 of 13 tasks
metrics: fix some bug for tikv performance approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#63929 by bufferflies was merged Oct 14, 2025 Loading…
1 of 13 tasks
planner: move index related analyze into ddl index.go approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#63924 by AilinKid was merged Oct 14, 2025 Loading…
1 of 13 tasks
dxf: refactor error handling in task executor do-not-merge/cherry-pick-not-approved ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#63907 by joechenrh was closed Oct 27, 2025 Loading…
1 of 13 tasks
gc_worker: Refine some metrics about GC approved lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#63888 by MyonKeminta was merged Oct 14, 2025 Loading…
1 of 13 tasks
kv, owner: remove unused variables, functions, and struct fields approved contribution This PR is from a community contributor. first-time-contributor Indicates that the PR was contributed by an external member and is a first-time contributor. lgtm ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#63879 by amrable was merged Oct 15, 2025 Loading…
2 of 13 tasks
*: bump client-go to fix #63873 approved cherry-pick-approved Cherry pick PR approved by release team. lgtm ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#63874 by zyguan was merged Oct 9, 2025 Loading…
1 of 13 tasks
ProTip! Mix and match filters to narrow down what you’re looking for.